Concrete slab for Villa Anneberg

In the end of augusti 2014 the digging and preperation to build the concrete slab to start. The ground where the house and garage is going to be placed is a old agricultural land. It was pretty easy to dig up the ground, no big rocks and other stuff that takes time to get rid off. About 40 centimeter into the ground was needed to dig to have a stable ground to build the foundation for the concrete

Bygg
house ground
house ground

In the end of augusti 2014 the digging and preperation to build the concrete slab to start. The ground where the house and garage is going to be placed is a old agricultural land. It was pretty easy to dig up the ground for the Tegneby Åkeri, no big rocks and other stuff that takes time to get rid off. About 40 centimeter deep into the ground was needed to dig to have a stable ground to build the foundation for the concrete slab.

Pictures of the digging to finished concrete slab

 

 

agricultural land
agricultural land
excavator
excavator
concrete slab
concrete slab
district heating
district heating
house ground
house ground
house ground
house ground
finished concrete slab
finished concrete slab